Manufacturingin motion.
Logistics coordination for raw materials, components, machinery, and finished goods through carrier partners, planned around your production schedule.
Freight across the
production cycle.
See where the shipment fits: into production, between facilities, or out to its next destination.

Inbound materials
Raw materials and components moving from suppliers to production facilities.

Plant-to-plant transfers
Work in progress, components, and equipment moving between facilities.

Finished-goods distribution
Packaged products leaving production for warehouses, distribution centers, or customers.
Know the freight.
Different manufacturing loads call for different packaging, loading methods, and equipment considerations.

Raw materials
Palletized inputs, packaged materials, and production supplies.
- Typical equipment
- Enclosed or open-deck equipment, depending on cargo and loading.
- Before pickup
- Identify the commodity, total weight, packaging, and unloading method.

Components & parts
Boxed parts, assemblies, and palletized production components.
- Typical equipment
- Dry van or shared freight capacity, depending on shipment size and handling.
- Before pickup
- Confirm piece count, packed dimensions, stackability, and delivery references.

Machinery & equipment
Crated machinery, machinery skids, and industrial equipment.
- Typical equipment
- Dry van, flatbed, or step-deck, subject to fit and loading access.
- Before pickup
- Provide measured dimensions, weight, lifting points, and securement instructions.

Finished goods
Packaged products, palletized inventory, and outbound production orders.
- Typical equipment
- Dedicated or shared enclosed equipment, depending on volume and requirements.
- Before pickup
- Prepare protective packaging, labels, shipping documents, and receiving instructions.
Equipment, matched to the load.
Start with cargo dimensions, packaging, and loading access. Confirm the actual equipment for each shipment.
Enclosed dry van
A common starting point for packaged manufacturing freight that needs protection from weather during transport.

- Consider for
- Palletized materials, boxed components, crated products, and finished goods that fit through the trailer doors.
- Check before pickup
- Packed dimensions and total load weight
- Interior clearance, door opening, and stackability
- Dock access and forklift loading arrangements
Plan your shipment.
A clear brief brings the freight profile, production window, and facility requirements into one conversation.

Cargo & packaging
- Commodity & piece or pallet count
- Packed dimensions & total weight
- Stackability, lifting points & securement

Timing & appointments
- Cargo-ready date & pickup window
- Delivery window & receiving hours
- Appointments & site contacts

Access & handling
- Dock, forklift, crane or ground access
- Loading & unloading responsibilities
- References, paperwork & handling instructions
Some details still unknown?Start with what you have, then work through the remaining requirements.
Shipping preparation guideService paths to consider.
Shipment volume, handling, and delivery requirements help determine which option is appropriate.
Full Truckload
Dedicated trailer space for larger loads or shipments where fewer transfers and coordinated appointments matter.
Less Than Truckload
Shared freight capacity for smaller, packaged loads that can accommodate network handling and transit.
Expedited Freight
A service path to discuss when a required arrival or urgent production need shapes the move.
Specialized Freight
Equipment planning for machinery, unusual dimensions, or cargo requiring side or overhead loading.
Equipment, capacity, and achievable timing are confirmed for the individual shipment.
What details help start a manufacturing freight request?
Share the commodity, pickup and delivery locations, cargo-ready date, required arrival window, piece count, dimensions, and total weight. Include packaging, loading equipment, facility access, and any special handling instructions.
Can the plan cover plant-to-plant transfers?
Share the origin and receiving facility requirements, shipment profile, and appointment windows. Suitable equipment and availability must be confirmed for the individual transfer.
How should machinery be prepared for a freight discussion?
Provide measured dimensions and weight, photographs where useful, the packaging or skid arrangement, and the lifting points or loading method. Include any parts that can be removed and securement instructions from the equipment manufacturer.
What if the shipment has a time-critical production deadline?
Provide the earliest cargo-ready time and latest acceptable arrival, along with loading and receiving hours. Discuss whether expedited options should be reviewed. Availability and achievable timing need to be confirmed for that shipment.
Which service is right for our shipment?
The answer depends on freight size, packaging, handling, timing, and facility access. The service guides are a starting point; discuss the shipment requirements with the team before selecting equipment or relying on capacity.
Have a shipment
in mind?
Share your freight, locations, and timing to start the conversation.